1,650,000

Injury

Our Client was injured on a construction site when he contacted an outdoor light fixture with his left arm. He suffered serious injuries including a dislocated right shoulder, concussion and burns to his arms, chest, hands and feet. Our Client suffered permanent neurological/cognitive symptoms including brain fog, memory loss, irritability, tinnitus, loss of balance as well as pain, numbness and loss of range of motion from his orthopedic injuries.

Result

Settlement for the amount of $1,650,000.

1,650,000

The Injury

Client suffers serious injuries following electrical shock on construction site in 2018. Client is nearing the normal age for retirement from his particular construction trade, but he planned to work for several more years. He suffers cognitive loss of function, tinnitus, loss of feeling in his hands and a significant shoulder injury requiring surgery. He never returns to work.

The Challenge

Bowser Law litigates matter for five (5) years through the Massachusetts Superior Court against four (4) alleged responsible defendants, including two (2) governmental entities. The defendants are unified in their position that the plaintiff/client and his own employer are exclusively responsible for his injury and the work site conditions that led to the electrical shock injury and they dispute the nature and extent of the client’s injury and his ability to return to work.

The Result

Through the use of retained experts in the fields of engineering and electrical construction as well as expected trial testimony from the client’s treating neurologist, Bowser Law is able to settle the matter through mediation shortly before jury selection. Total settlement of $1,650,000 with all four defendants allows significant recovery for plaintiff after compromise and reimbursement on Workers’ Compensation insurance carrier lien.

1,650,000

Injury

Client suffers serious injuries following electrical shock on construction site in 2018.  Client is nearing the normal age for retirement from his particular construction trade, but he planned to work for several more years.  He suffers cognitive loss of function, tinnitus, loss of feeling in his hands and a significant shoulder injury requiring surgery.  He never returns to work.

Challenge

Bowser Law litigates matter for five (5) years through the Massachusetts Superior Court against four (4) alleged responsible defendants, including two (2) governmental entities.  The defendants are unified in their position that the plaintiff/client and his own employer are exclusively responsible for his injury and the work site conditions that led to the electrical shock injury and they dispute the nature and extent of the client’s injury and his ability to return to work.

Result

Through the use of retained experts in the fields of engineering and electrical construction as well as expected trial testimony from the client’s treating neurologist, Bowser Law is able to settle the matter through mediation shortly before jury selection.  Total settlement of $1,650,000 with all four defendants allows significant recovery for plaintiff after compromise and reimbursement on Workers’ Compensation insurance carrier lien.

425,000

The Injury

Torn skin and lacerations to both hands, partial constriction injury to fourth and fifth fingers of left had, impact injury to left tibial tuberosity

The Challenge

Client falls on paved walkway outside of her place of employment. Slip and fall caused by an accumulation of varied size rock salt granules on walkway causing loss of traction. Client undergoes various treatments to include steroid injections and physical therapy, but she does not miss any time from work. Worker’s Compensation insurance pays approximately $13,000 on $17,000 in related medical bills . Commercial Insurance general liability carrier denies claim. Suit filed. At mediation the same carrier offers only $5,000 to settle, but then formally withdraws that offer following medication and before trial.

The Result

Bowser law selects jury in Hillsborough County (NH) Superior Court. Evidence establishes paved walkway was installed by commercial landlord to cover dirt path worn into landscape over many years from employees taking most direct route to entrance. Landlord did not consult any engineers or architects before installing “paved to grade” walkway. Bowser Law’s engineer/architect expert witness opines the walkway was dangerously steep as constructed and especially hazardous when sprinkled with rock salt that undermined traction. This was not a snow and ice case, but rather a defective construction design case. Bowser Law insists on and obtains an in person view of unchanged walkway by selected jury prior to start of trial. Other existing nearby walkways from the same parking area utilized steps and handrails to address change in grade across landscaped area in front of building. Jury verdict of $425,000 on damages with 25% offset for comparative fault. Pre-trial interest award of $46,000 and taxation of costs of $20,000 ordered by Court following verdict.

132,500.00

Challenge

General Contractor and sub-contractor for construction project each deny premises liability and blame injured plaintiff for walking through unlighted garage area in where open pit is located. Plaintiff establishes that both parties were responsible for overall safety of worksite and regular exit of building was blocked by construction debris, thereby leaving unlighted garage as only available exit from building. Plaintiff’s expert establishes numerous construction site safety violations under both OSHA and State Building Code regulations.

Result

Settled prior to trial at mediation for $132,500.00

828,000.00

Injury

Union painter falls on construction site when he steps on copper pipe left on floor and covered with sawdust. Torn meniscus of left knee and total tear of right knee MCL/ACL. Medical bills exceed $83,000. Lost wage claim includes total permanent disability from occupation as painter.

Challenge

Insurance company for general contractor responsible for job site safety denies liability, questions the plaintiff’s credibility and challenges the extent and nature of his injuries. Pre-trial offer of $300,000 reduced to $250,000 at trial. Plaintiff owes $220,000 to Worker’s Compensation Insurance Carrier.

Result

Jury verdict following eight (8) day personal injury trial before the Suffolk Superior Court in Boston, MA. Verdict of $775,000. Pre-trial interest and comparative fault offset results in total judgment against responsible general contractor for $828,000.